FROM REQUIREMENT TO REVIEWED HARDWARE
Plan the part.
Understand the limits.
Start with the geometry, frequency and evidence your decision needs. Compare published lens configurations, see what remains application-specific, and prepare a useful first brief.
Updated November 25, 2026 · Published references describe their own configurations. Procurement specifications, availability and acceptance criteria require confirmation.
PRODUCTION & PROCESS
Separate build capability from delivery commitments.
Bonner et al. report these process capabilities in Section 3.1.3. They are reference capacity figures, not available inventory, a demonstrated lot-yield statistic or an order-to-delivery promise. Confirm packing, cleanup, inspection and scheduling for your order.
Source: Bonner et al., Optical Engineering 65(2), 025104 (2026), §3.1.3
| Configuration | Diameter | Unit cell / lattice | Listed weight | Listed maximum frequency |
|---|---|---|---|---|
| LUN-D-62-2 | 62 ± 1 mm | 2 mm diamond | 47 g | 100 GHz |
| LUN-D-100-2 | 100 ± 2 mm | 2 mm diamond | 207 g | 100 GHz |
| LUN-G-62-5 | 62 ± 1 mm | 5 mm gyroid | 51 g | 40 GHz |
| LUN-G-100-5 | 100 ± 2 mm | 5 mm gyroid | 212 g | 40 GHz |
All four configurations list an effective permittivity range of 1.15–2. Diameter tolerances apply to these lens configurations; they are not lattice-strut tolerances or process repeatability. The sheet labels gain values as estimates. The frequency ceiling does not guarantee gain or coverage throughout the band.
Source: Luneburg Lens Specifications, configuration table and footnotes
| Decision | Current public evidence / next information needed |
|---|---|
| Standard vs custom lead time | No committed turnaround is published here. Request availability for a listed configuration; request a scoped schedule for custom design, fabrication and validation. |
| Feature accuracy & repeatability | Request a drawing-specific tolerance review and relevant inspection data. No COT lattice Cpk, lot-to-lot distribution or large-aperture repeatability figure is established by the linked references. |
| Surface finish at mmWave | No COT lattice Ra/Rz acceptance value is provided here. Define the RF-critical surfaces, cleanup requirements and inspection method, then validate transmission or antenna performance on the actual geometry. |
| Prototype to production | Vista is the platform used for the published lenses. Inkbit describes VCJ for low-to-high volume work. A production transfer still needs agreed material, geometry revision, process controls, inspection, yield and acceptance criteria; identical platform does not mean an automatically qualified part. |
Source: Inkbit VCJ technology and production platform overview
DESIGN RULES & LIMITATIONS
A smaller cell is only one part of the design.
Feature size is not a tolerance.
The paper reports 100–300 μm minimum features for its process. Treat this as research context, not a universal design-rule clearance. A unit cell is a different dimension from its struts or walls.
Source: §3.1.3
Match cells to the operating band.
The lens sheet lists 2 mm diamond cells to 100 GHz and 5 mm gyroid cells to 40 GHz. Use those configuration-specific limits, then evaluate the actual topology, density, feed and aperture.
Source: Configuration limits
Check where the model stops working.
The paper identifies unit-cell bandgaps and effective-medium breakdown, material absorption, and surface permittivity mismatch as performance limits. A larger aperture does not automatically produce higher realized gain.
Source: §§2.4–2.6 and §3.3
Review the complete envelope.
A machine build envelope is not the maximum usable size of every COT part. Include supports, cleanup access, mounting features, orientation and inspection access in the feasibility review.
Design-review checklist; confirm the usable envelope for your configuration.
COMPETITIVE COMPARISON
Compare the same component and acceptance test.
Use this matrix to structure supplier evaluation. It identifies the questions that matter for each route; it is not a measured ranking or a claim that one process is always faster, lighter or lower loss.
| Route | Performance evidence | Lead time | Design freedom | Weight | Assembly risk |
|---|---|---|---|---|---|
| Machined low-loss dielectric | Measure the selected stock and finished geometry at your band. | Quote stock, machining and inspection. | Review tool access to internal features. | Compare final CAD volume and material density. | Check whether the geometry needs splits or bonds. |
| Injection-molded approximation | Validate the molded approximation of the target dielectric profile. | Separate tooling approval from recurring production time. | Review mold release, core access and permitted geometry changes. | Compare the actual walls, cores and reinforcement. | Check inserts, seams and required secondary operations. |
| Multi-part dielectric assembly | Include interfaces and alignment in the model and test. | Quote all parts plus assembly and inspection. | Evaluate discrete layers against the intended continuous profile. | Include bonds, fasteners and support structures. | Define alignment and interface acceptance criteria. |
| Other additive approaches | Request material and component results at matched frequencies. | Include preparation, printing and postprocessing. | Review the process-specific feature and support limits. | Compare validated fill fraction and required support hardware. | Check joining, cleanup access and dimensional verification. |
| VCJ + COT | Start with linked material and lens evidence; validate your design. | Use the quoted schedule, not the published 24-hour capacity figure. | Review the engineered lattice and usable permittivity profile. | Use the listed lens weights only for those configurations. | A monolithic lens reduces internal part interfaces; feed and mount alignment still matter. |
Source: VCJ configuration weights and limits
Source: COT measurement context
For a quantitative comparison, request the same aperture, feed, band, pattern, quantity and acceptance criteria from every supplier. Cross-frequency loss-tangent values are not a controlled head-to-head benchmark.
SOFTWARE & DESIGN WORKFLOW
Keep electromagnetic intent visible through the handoff.
Construct provides lattice and skin operations, material assignment, build arrangement, time estimates and checks for thin features, collisions and mesh issues. It is build-preparation software. The public software reference does not document a native HFSS or CST connector, automatic model round-trip or supported solver-version matrix.
Source: Inkbit Construct software capabilities
Define the electromagnetic requirement.
Specify band, polarization, aperture, feed, scan range, gain, sidelobes and acceptable loss. Identify what is fixed and what can change.
Prepare a review package.
Include CAD or a dimensioned sketch, target permittivity distribution, material model, simulation plots and assumptions. If you use HFSS or CST, state the version, units, coordinates and available exports. Confirm the exchange format before preparing a detailed transfer.
Agree on the manufacturing representation.
Review topology, local density, minimum walls, interfaces, orientation and cleanup. Record any changes to the simulated geometry and decide which changes require another EM solve.
Build and validate against the brief.
Agree on inspection and RF measurements before fabrication. Compare the resulting part with its design revision, then define the controls needed for repeat orders.
Illustrative review workflow, not a promise of automated solver integration or a fixed service package. Your functional intent remains the acceptance target; feature sizes, density, orientation and interfaces remain subject to feasibility review.
COMMERCIAL & EVALUATION PATH
Start with the information you already have.
STANDARD LENS
Request a listed configuration.
Include the part number above, quantity, operating band, feed and destination. Ask for current availability, unit price, shipping terms and expected delivery before committing.
Request lens availabilityCUSTOM GEOMETRY
Request a feasibility review.
Share a non-confidential band, envelope, beam target, quantity and timing. CAD is optional for the initial inquiry. Use the goal field for tolerances, environmental needs and the current manufacturing baseline.
Start a custom reviewWhat happens after submission?
The form saves your brief and returns an ARC reference. Keep it for follow-up. A response-time commitment, standard price range and fixed custom-development timeline are not published here. For a time-sensitive request, email info@inkbit3d.com with your reference.
Request a staged schedule: feasibility and missing inputs; design and quote approval; fabrication and inspection; component validation. Ask the team to confirm dates and responsibilities for each stage.
Need an NDA first?
Select “I’d like to discuss an NDA” on the review form. Keep the initial brief non-confidential. That selection requests a discussion; it does not execute an NDA. Agree on the NDA and file-transfer method before sharing restricted design details.
RELIABILITY & NEXT VALIDATION
Qualify the finished structure for its environment.
The COT datasheet reports material test results; the lens sheet includes environmental notes. These do not establish thermal-cycle, vibration, humidity or outgassing qualification for every finished lattice or GRIN component.
- Define temperature range, cycles, dwell time, humidity, vibration, exposure and service life.
- Specify both mechanical acceptance and RF checks before and after environmental testing.
- Request configuration-specific reports and identify which requirements still need testing.
Source: COT Technical Datasheet, updated February 20, 2026
Source: Lens specification sheet, environmental notes
For demonstrated components, review the Cheshir GRIN application and drone integration spotlight. Larger apertures, multi-material variants and new qualification targets should be discussed as project requirements; no release date or qualification status is promised here.